Back to all projects

KISS

Impact

  • Designed the initial version of KISS in Rhino with a short grasshopper script to explore the nature of the two simple pivots interacting with eachother.
  • Produced preliminary rendering and drawings for competition submission.
  • Fabricated the structure along with my team at Tietz-Baacon Studios in Brooklyn.
  • Delivered and installed the complete structure in Columbus Circle to support the Architizer-sponsored Event.

Project Overview

Worked beside Guy Zucker on design from the outset of the project, designing the preliminary version of KISS in rhino with a short grasshopper script. Produced preliminary renderings and drawings for competition submission. Once announced as one of two winning designs, our team fabricated KISS in Brooklyn at Tietz-Baacon Studios.

Details

Role
Architectural Design Intern
Timeframe
June 2011 – August 2011
Tools
Three.js
SQL
Jira
Confluence
Figma
Tableau